Where a basement finishing budget goes
Framing and drywall together are a smaller line than people expect, $3,000 to $8,000 on a typical Toronto basement. The larger lines are the things you cannot see. Electrical upgrades are $5,000 to $10,000. Flooring is a genuine fork: carpet at $2 to $7 per square foot, laminate at $3 to $7, luxury vinyl plank at $5 to $9 and hardwood at $8 to $15, which on a 700 square foot floor is the difference between roughly $1,400 and $10,500. Drywall supplied and installed is $1 to $3 per square foot in a basement. A basic 500 square foot finish lands at $30,000 to $45,000 and a mid-range one at $45,000 to $70,000. If you want a bathroom, that is $15,000 to $35,000 on top and the job stops being permit-free.







