Which direction to add, on a Toronto lot
A rear or side addition at $360 to $480 per square foot builds on new foundations and keeps you living in the house through most of the work, but it consumes yard and is constrained by rear and side setbacks and lot coverage. A second storey at $350 to $550 per square foot consumes no land, which matters enormously on a narrow lot, but it means the roof comes off, the existing structure and footings have to be verified to carry the new load, and you are almost certainly out of the house for part of it. The published sweet spot for second-storey work is $375 to $450 per square foot. East York is the clearest example of where up wins: it was built with government-assisted single-storey housing for returning veterans, and adding a second floor to those bungalows has been the standard move there for decades. On a wide Scarborough or Vaughan lot, going back is usually simpler and cheaper.