Phone
(365) 360-7014
Every day, 7:30 AM to 11:30 PM
(365) 360-7014
Every day, 7:30 AM to 11:30 PM
info@renovatorstoronto.ca
We reply during opening hours
Every day, 7:30 AM to 11:30 PM
Site work follows City noise hours: 7 a.m. to 7 p.m. weekdays, restricted Saturday, none Sunday
Toronto, Etobicoke, North York, Scarborough, East York, Vaughan, Mississauga, Markham, Richmond Hill, Brampton, Oakville, Aurora, Newmarket, Milton, Pickering, Burlington
It decides the permit office, the zoning rules and, in four of our areas, whether Toronto Building or a separate municipality handles the application. It is the single most useful thing you can give us first.
Square footage for a room or basement, linear feet for a foundation or cabinet run, or a count for windows and doors. An approximate number is enough to give you a range on the phone.
For water in a basement, a crack, a stain or damage, photos let us tell you on the phone whether it is likely a drainage issue, a movement issue or something simpler.
Toronto plus 15 communities across York, Peel, Halton and Durham regions.
Four steps, none of which cost you anything.
Every day between 7:30 AM and 11:30 PM. If you send a form overnight it is answered in the morning, not three days later.
Enough to tell whether your job is a finishing project, a structural one or a permitted one, and to give you a range from published Toronto pricing before anyone visits.
We measure, check ceiling height at the obstructions, locate drains and stacks, check panel capacity and confirm the permit path for your address.
Scope, materials, permit and engineering allowances, payment schedule, start and completion dates, subcontractors and cleanup, with HST at 13 percent shown.
Renovator Toronto managed our condo renovation efficiently and respected the building rules throughout the project. The workmanship was clean, and the project stayed well organized.
Renovator Toronto transformed our outdated kitchen into a functional and modern space. The team kept us informed at every stage, and the finished work exceeded our expectations.
The crew completed our basement renovation with excellent attention to detail. They listened to our needs, offered practical suggestions, and created a comfortable space for our family.
Yes. The site visit and the itemized written estimate cost nothing and carry no obligation. Provincial guidance recommends deposits of 10 percent or less of project cost, and that is what we work to once a job is agreed.
Within our opening hours, which are every day from 7:30 AM to 11:30 PM. A form sent at 2 a.m. is answered that morning.
We can give you a range from published Toronto pricing if you tell us the service and a rough size, and the cost calculator on this site does the same thing. We will not give you a firm price without seeing the property, because the things that move the number are the things you cannot see from a description.
Under Toronto Municipal Code Chapter 591, construction noise must not be clearly audible from 7 p.m. to 7 a.m. Monday to Friday, is restricted on Saturday, and is not permitted at all on Sunday or statutory holidays without a Noise Exemption Permit. Condo buildings usually impose tighter hours again.