Fees are per square metre of floor area. Interior alteration is $11.53 for Group C, E and F, $12.45 for Group A, B and D and $13.41 for residential with floor replacement. A residential addition is $18.56, finishing a basement including second suite work is $6.20, and underpinning is $12.37 per linear metre. The minimum fee on any permit is $214.79, the examination and inspection hourly rate is $92.79, and a new laneway or garden suite zoning certificate is $644.38 and non-refundable.
Any change to the structure, the openings or the systems: removing or adding a wall, cutting or enlarging a window or door opening, enclosing a deck or porch, a deck more than 60 cm above grade, an addition, underpinning, a second suite, and new or altered plumbing or heating. Replacing a window or door in the same opening, swapping a furnace or boiler, re-roofing without structural work, fixture repairs, insulation, drywall, cabinetry, millwork, painting and a basement finish with no structural change, no new plumbing and no added unit do not. Zoning compliance applies either way.
Months, and we will not put a figure on it because the City does not publish one and the schedule varies by ward and caseload. What we can do is tell you at the site visit whether your design is as-of-right or needs a variance, which is the part that is within anyone's control.
Toronto's Multiplex By-law permits two, three or four units as of right in the R, RD, RS, RM and RT zones, including by converting an existing house, provided at least one unit sits wholly or partly above another. That is separate from the secondary suite rules, which permit one secondary suite per dwelling unit.
For general basement living space the Ontario Building Code rule is 2,100 mm over at least 75 percent of the basement area, reduced to 1,950 mm under beams and ducts. A secondary suite needs 1.95 m, reduced to 1.85 m clear under beams and ducts. We measure at the lowest obstruction because that is the number that governs.
No. The lot cannot be severed for separate ownership, which makes a garden or laneway suite a rental or family-use asset rather than a property you can sell on its own.
We take a 50% deposit when the written contract is signed. The contract must also state business contact details, itemized work and materials, warranty, total cost with taxes, payment schedule, start and completion dates, subcontractors and who handles cleanup.
Thirteen percent. Every price range on this site is before HST, and your written quote shows the total with HST included.
Three documents: the written contract itself, a current certificate of insurance, and a WSIB clearance certificate. Independent operators, sole proprietors and some partners and executive officers working in construction must carry WSIB coverage, and a business must register within 10 calendar days of hiring its first employee.
Not Tarion. It covers new Ontario homes, freehold and contract homes, condominium units and conversions, and it explicitly excludes alterations, deletions and additions made after purchase. On a renovation your protection is the written contract, the insurance certificate and the WSIB clearance. Ask for all three in writing before work starts, from us or from anyone else quoting the job.
Not always. Finishing a basement with no structural change, no new plumbing and no additional dwelling unit does not need a building permit. Add a bathroom, move a wall, cut an egress window, underpin the floor or create a second suite, and it does. The City's 2026 permit fee for finishing a basement in a house or townhouse, including second suite work, is $6.20 per square metre of floor area.
Yes. The City's Basement Flooding Protection Subsidy Program covers 80 percent of the invoiced cost of eligible work up to $6,650 per property, effective 1 May 2026. Within that total, a backwater valve is covered to $1,600 each for up to two devices, a sump pump to $2,250, a battery backup to $300, severing and capping the foundation drain to $400, and a plumbing assessment to $500. You apply within two years of installation, a licensed contractor has to have done the work, and your downspouts have to comply with the disconnection requirement. We do the work and hand you the invoice and paperwork in the form the City asks for.
The footprint is the lesser of 40 percent of the rear yard or 60 square metres, and the interior floor area has to stay below the main house. Height is 4.0 m if the suite sits 5.0 m from the house, rising to 6.0 m at 7.5 m of separation, and a 45 degree angular plane starting at 4.0 m applies on the front, rear and sides. A garden suite also needs a 1.0 m unobstructed emergency access path with 2.1 m of vertical clearance within 45 m of a public street, and it cannot require removal of a protected tree. No car parking is required, two bicycle spaces are.
Every day, 7:30 AM to 11:30 PM. Call (365) 360-7014 or send the estimate form at any hour and we reply during those hours. Site work follows the City's noise bylaw hours, which are tighter than our phone hours.
A laneway suite needs a lane. The lot must have at least 3.5 m abutting a public laneway, the suite can be up to 10.0 m long by 8.0 m wide and two storeys, and height reaches 6.3 m once it sits 7.5 m or more from the house. A garden suite is the version for lots with no lane, capped at 60 square metres of footprint and 6.0 m of height. Both are additional dwelling units under the same City framework, neither requires a parking space, and both require two bicycle spaces.
An itemized written scope: demolition, structural work, materials with the line each one sits on, permit and engineering allowances where they apply, the payment schedule, start and completion dates, which subcontractors are involved and who handles cleanup. Total cost is shown with HST at 13 percent. Prices on this site are ranges, not your price. Any workmanship warranty is set out in your written quote, job by job.
Four things decide it: ceiling height, an egress window in every bedroom, a rated fire separation between the units and the shared exit, and smoke and carbon monoxide alarms interconnected through the whole house. Electrical work has to be inspected and approved by the Electrical Safety Authority. Zoning adds its own limits. One secondary suite per dwelling unit, and the suite cannot exceed 45 percent of the home's interior floor area, except that a one-storey detached house may use the whole basement. No extra parking space is required.
It can. Under Toronto Municipal Code Chapter 813 a permit is required for any activity that removes or injures a private tree 30 cm or more in diameter at breast height, measured 1.4 m from the ground, and every City street tree is protected regardless of size. The tree protection zone is 2.4 m of radius for a 30 to 40 cm tree, 3.0 m for 41 to 50 cm and 3.6 m for 51 to 60 cm, doubled in ravines and natural areas. Excavation, vehicle operation, material storage and soil disturbance inside that zone all trigger the permit. We map the protection zone before an excavator is booked.
Yes, in the cases that matter. A Professional Engineer has to design the underpinning where the new foundation goes below an adjacent building's footings within the soil's angle of repose, and professional review is mandatory where the unsupported underpinning height exceeds 1200 mm. Both conditions are normal on a Toronto semi or a narrow-lot detached house. Underpinning also needs a building permit. The City's 2026 fee is $12.37 per linear metre.
Under Toronto Municipal Code Chapter 591, construction noise must not be clearly audible from 7 p.m. to 7 a.m. Monday to Friday. On Saturday it is restricted from 12:01 a.m. to 9 a.m. and from 7 p.m. to midnight. It is not permitted at all on Sunday or statutory holidays unless the City issues a Noise Exemption Permit. That is why a schedule promised with weekend work in it is usually a schedule that slips. We build the timeline around the bylaw instead.
Ontario's Consumer Protection Act requires a written agreement for any contract over $50. A contract signed at your home is a direct agreement, which you can cancel within 10 days without giving a reason or paying a penalty, with deposits refunded within 15 days of your cancellation notice. A contractor cannot exceed a quoted estimate by more than 10 percent unless you approve the additional or different work in a signed change to the contract, and you can cancel within one year if you never received a compliant copy of the contract.
(365) 360-7014, every day 7:30 AM to 11:30 PM
info@renovatorstoronto.ca
Four of our areas are inside the City of Toronto and eleven are separate municipalities with their own rules. The address changes the answer.